In May of 2016 I was commissioned by Aaron Michaelis from Faris Family Wineries to create a barn door to create a more permanent divide between the tasting room and the executive offices used daily. In addition a 16’ curtain utilizing galvanized pipe, as well as a 6’ shelf to match both the curtain rod and new barn door.

I traveled up to Napa for an onsite visit to get a feel for the aesthetic and decor that the new barn door would be living with. I also too take hard points to streamline the design process eliminating back and forth once the design was approved.

Frias-Family-Vineyard-4.jpg

Upstairs decor.

Doorway for new barn door

A B C D
A

A

B

B

C

C

D

D

Having hard data points about the barn door, allowed me move straight to 2D cad and then 3D (Rhino). Sending the above 4 designs gave the client options as well as showing them what the design would look like pulled apart helped them invions the door in its open state. The client choose B. Having the CAD complete made a fast transition to completeing the quote for approval as well as setting up the buy and cut list.

IMG_9574.jpg
 

I used pine, sourced from the local big box hardware store, for the project for pricing and scaling constraints as this was a temporary fix until they move to a larger tasting room. Keeping the grain consistent was my biggest hurdle at this point of the project.

Production

After milling all internal touching side to create a better fit, I wood glued and nailed the two independent doors together.

Side 1

Side 1

Side 1 & 2

Side 1 & 2

IMG_9593.jpg
 

Due to the unfamiliar nature if the angles created by the diagonals, I decided to create a cardboard template for the cross members.

Repeat for each corner of the door.

IMG_9596.jpg
IMG_9597.jpg

Finish & Finishing

At this point I sanded the door getting ready for the final coat of. Concurrently I prepped some finish panels for the client to review so they can choose their preference.

IMG_9947.jpg
IMG_9614.jpg

Finishes

IMG_9560.jpg

Deep Brown | Grey Brown | Rustic / Non Rustic Options

Stain

Stain

Top Coat

Top Coat

Install

First Hanging of the Doors

First Hanging of the Doors

Floor and Rail Horizontal Misalignment

Floor and Rail Horizontal Misalignment

Vertical Door Misalignment

Vertical Door Misalignment

Close Up

Close Up

Problems!!!!!!

  • Weight of the door did not hold in the drywall even with anchors

  • Door would not alignment with the floor

  • Door would not stay shut or align vertically

Solutions

IMG_9990.jpg
 

The pre-bought hardware, plus the unconventional opening did not allow me to attach the rail to the studs which were not spaced at typical 16”/24” spacing. So I created a header panel that I could attached to the studs, which would in turn hold the rail sucurly. I did have to remove a section to allow the HVAC to flow freely.

 
 

Redrilling to creating an oval opening allowed me to mitigate the horizontal and vertical alignment issues. All alignment would be done on site by eye due to various variable like floor slope, and uneven doorway opening due to settling of the original construction.

IMG_9969.jpg
81CsBpjlWzL._SL1500_.jpg
 

The doors did not want to stay shut, sliding about 1.5” away from one another when “shut”. This was not acceptable. I decided to solve this problem by hiding magnets on the top of the door out of sight.

Finished Product